OFFICE ORDERS/CIRCULARS

 

Updation date : 15/11/2021                                                                                                                       Updation Frequency : As when require

S.No.

Order/Circular

Date

Hosting Date

Issuing Authority

93 Revision of admistrative sanction for Developement of Infrastructure for proposed Electric Vehicle Zone at I/A Karoli Unit Office-Bhiwadi-II 12.11.2021 15.11.2021 CGM (F)
92 Service Charges Rates inn F.Y. 2021-22 31.03.2021 05.04.2021 Sr. RM (Sriganganagar)
91 Service Charges Rates in F.Y. 2021-22 01.04.2021 05.04.2021 SR. RM (Jaipur Rural)
90 Re-fixation of allotment rate of industrail plots at industrial area, Kakani, Jodhpur 30.03.2021 31.03.2021 CGM
89 Implementation of solid Waste Management Rules, 2016, hazardous and other waste Rules 2016 and E-Waste Management Rules, 2016 in Industrial Area Gundi-Fatehpur. 04.03.2021 09.03.2021 SRM (Kota)
88 Implementation of reservation/concession of industrial plots in Industrial Area Gundi-Fatehpur. 04.03.2021 09.03.2021 SRM (Kota)
87 Defect Libaility period for all types of work costing more than 10 lakh shall be 5 years 22.01.2021 23.01.2021 GM(Civil)
86 Partial amendment in the decision taken by the IDC vide item(20) of its meeting dated 07.12.2000 related  to sanction of all sizes of water connectionin RIICO Industrial Areas. 22.01.2021 22.01.2021 GM (Civil)
85 Relief Package for the Existing Standard loan Accounts of the Corporation in wake of covid-19 pandemic & follow up lockdown(s). 21.07.2020 22.07.2020 AGM (Investment)
84 Implementation of Solid Waste Management Rules, 2016 and E-Waste Management Rules, 2016 in RIICO Industrial Areas. 16.07.2020 17.07.2020 GM (EM)
83 Amendments in Scheme for Corporate Loan, Incentive Scheme for Good Borrowers, Graded Interest Rebate System Scheme (GIRS) and Policy of the Corporation with regards to non-levy of interest 18.05.2020 18.05.2020 CGM (I)
82 In view of COVID-19; all the Unit Offices and Head Office of RIICO shall open from 20.04.2020 to 03.05.2020 in the modified Lock Down 18.04.2020 18.04.2020 DGM (HRD)
81 In the wake of lockdown: Relief package for existing good borrowers   09.04.2020 CGM (I)
80

Amended Scheme for financing of Industrial Land in RIICO Industrial Areas

Scheme, Form

24.12.2019 24.12.2019 CGM(I)
79 Submission of photographs and Geo-tagging of works. 21.10.2019 22.10.2019 GM(Civil)
78 To update the borrowers & Guarantors details in respect to Term Loan accounts 16.08.2019 20.08.2019 CGM
77 Implementation of Solid Waste Management Rules, 2016 and E-Waste Management Rules, 2016 in Various Industrial Areas of Jodhpur Unit 31.05.2019 07.06.2019 Unit Head
76 Circular:Change of Service Charges in the unit of Jaipur (Rural) 23.04.2019 24.04.2019 Sr.DGM
75 Display information of water tariff ahead of billing cycle 18.03.2019 18.03.2019 GM (Civil)
74

Policy for Installation/ Laying of Telegraph Infrastructure in Industrial Areas of Corporation (including Transferred Industrial Areas)

Policy & Form

03.01.2019 09.01.2019 GM (Civil)
73 Third Party Inspection of Civil and Electrical works at Industrial Areas of the Corporation 19.07.2018 23.10.2018 GM(Civil)
72 Green Building Incentive for Promotion of Green Buildings in Industrial Areas 27.07.2018 30.07.2018 CGM (Inv)
71 Water Tariff and all other charges on all categories are kept in abeyance 16.04.2018 16.04.2018 GM (Civil)
70 Online application for new water connection by consumers in the industrial areas is being received in SWCS 08.03.2018 12.03.2018 GM (Civil)
69 Revision in the Interest Rate of Term Loan(s) 20.12.2017 21.12.2017 CGM(Inv.)
68 Circular No.627 : The usage of AC pressure pipe 01.12.2017 04.12.2017 GM
67 Policy to permit laying of utility lines in RIICO industrial areas by various agencies 31.10.2017 01.11.2017 GM (Civil)
66 Revision in the Interest Rate of Term Loan(s) 20.07.2017 21.07.2017 GM (Inv.)
65 Regarding supporting color photographs should be sending the completion of work 2306.2017 23.06.2017 GM (Civil)
64 Fixing the existing rates of water supply to be charged from consumers of RIICO Industrial Areas and Residential Colonies 19.04.2017 20.04.2017 GM (Civil)
63 Timely disposal of online new water connection (Industrial/Commercial) 08.02.2017 28.02.2017 GM (Civil)